Barn Slab:
Total yards = 45 yards in 5-yard pours.

The five-yard pours where required so that ranch equipment could be moved between sections and then moved onto the cured concrete. The Project spanned three weeks between other work projects.

“The C.U.B.E. worked great for my needs. I could only pour a few yards before moving equipment between the individual stalls. A transit-mix truck would have been tough to schedule and the C.U.B.E. let me mix when I needed it.”

Estimated Cost Savings: $2,475.